Salto Grande hydroelectric dam

A large hydroelectric dam on the Uruguay River shared by Argentina and Uruguay, whose gates were opened to relieve rising river levels.

Also known as: Salto Grande Dam

Overview

The Salto Grande hydroelectric dam is a large hydroelectric dam on the Uruguay River, located between Concordia, Argentina, and Salto, Uruguay, and shared by the two countries.

Technical features

  • Construction began in 1974 and was completed in 1979.
  • Power is generated by fourteen Kaplan turbines, with an installed capacity of 1,890 MW.
  • The reservoir has a total area of 783 square kilometres, with maximum dimensions of 140 by 9 kilometres.
  • The dam passes approximately 64,000 cubic metres of water per second, compared with the current average flow of the Uruguay River at 4,622 cubic metres per second.

Role in flood management

During heavy rains linked to El Niño, the dam gradually opened its gates to relieve the rising Uruguay River, flooding parts of cities downstream and leaving several dozen people out of their homes.

Associated infrastructure

The Salto Grande Bridge, a road and railroad bridge, crosses the Uruguay River on top of the dam and connects Concordia, Argentina, with Salto, Uruguay.